Davenport Rock Island Moline, IA, October 30, 2026 — Centennial Bridge traffic in Davenport will experience a shift in access points starting Monday, as temporary changes are implemented for ongoing ramp work. The primary access to the bridge will be rerouted to Gaines Street.

This alteration in traffic flow is directly associated with a flood control project that necessitates repairs and modifications to the bridge ramps. The duration of this specific access change was not detailed in the available information.

Officials are advising motorists to anticipate potential delays and to exercise caution when navigating the area. The specific contractor responsible for the ramp work was not identified. Details regarding the scope of the flood project beyond the ramp work were also not provided.

The project aims to address flood-related infrastructure needs, but further specifics on the overall flood project’s timeline, objectives, and completion date were not immediately available. Drivers are encouraged to stay informed about traffic updates as the situation evolves.


Story summarized from the original created by KWQC staff on www.kwqc.com, see more information here.

Media gallery

SignalNewsAI
About The Author